Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0400-0022-E]
Application
Overhead Monorail System with shifting bride in a paint shop
Country
Switzerland
City
Reinach
Representative office
Conductix-Wampfler AG [CH]
Operator
Magnus Ankli GmbH
Product[s]
Technical requirement[s]
Carriage of material, e.g. modelbuilding up to 250 kg in a paint shop
System course
Straight - Shifting bridge with 15 straight courses; Area 400 m2
Additional information
Swivel piece
New engineered shifting bridge